DEED Facts
Facts about Saskatoon's Future Downtown Event and Entertainment District (DEED)
Saskatoon makes its best decisions when neighbours work from the same information. DEED Facts is an independent source providing clear, current, and fact-based information about the Downtown Event and Entertainment District (DEED).
Ask a question, share information, and help shape Saskatoon’s future.
COSTS
DEED is five separate projects, each with their own costs.
DEED is made up of five projects planned in three phases. Each project can only move ahead once funding is in place and City Council approves it.
The projects and estimates (in 2024 dollars) are:
-
Event centre: $632 million
-
Convention centre and theatre rehabilitation: $273 million
-
Downtown infrastructure, utility upgrades, and land: $180 million
-
Public parkade and underground access: $75 million
-
Public plazas, connecting parks, and area improvements: $57 million
The whole district is estimated at $1.22 billion (2024 dollars), including land. Costs are expected to go up before construction starts.
The City will bring updated cost estimates to the Governance and Priorities Committee in January 2027.
SOURCES


TIMEFRAME
DEED will be built in phases. Each phase will start once the money is in hand.
The City will build DEED in phases as funding is secured. The planned order is:
-
Underground work and public spaces, including utilities, streets, and plazas;
-
Modernizing and expanding TCU Place, including a new underground parkade; and
-
Building a new downtown event centre.
Design and construction will only proceed once funding for all projects is in place. Until a project is funded, it stays "shelf ready." The concept design is done, so it will move ahead once money is in place and City Council has approved it.
No start dates have been set.
SOURCES
PARKING
Downtown has off-hours parking supply. There will be more ways to park and get to DEED.
Downtown Saskatoon has more than 11,000 parking spaces within a 15-minute walk of the planned event centre. On a typical evening at 7 p.m., more than 8,000 of them are empty. A new underground parkade with 532 spaces is also planned under the convention centre.
According to a October 2, 2026 fact sheet from the City, if people drive to events the way they do today, more than 2,000 of these spaces will still be available during a sold-out event. The district will use existing downtown parking, which will include private business lots.
Given DEED’s central downtown location, some visitors will not need to park at all and instead choose to walk, cycle, or take public transit. Three Bus Rapid Transit (BRT) lines will intersect near the site (expected July 2029). These changes will reduce parking demand and traffic.
SOURCES


TRAFFIC
Event traffic will add fewer cars than downtown already handles at evening rush hour.
As part of the City’s 2023 Conceptual Design Report, traffic studies tested how downtown traffic might change with large events. They used cautious assumptions for opening day: 72% of fans would drive, 11% would take the bus, 7% would walk or cycle, and 10% would arrive by ride-share. More than 75% would arrive in the hour before the event (assumed to be 6 to 7 p.m.). They then tested how busy the main intersections near the district would get during that hour.
Given these assumptions, event traffic will add fewer cars than downtown already handles at the normal evening rush hour. Some intersections close to DEED would be busy, but overall traffic is not expected to exceed that of a typical weekday evening.
SOURCES
COST OF DOING NOTHING
Saskatoon's event venues will fall further behind other cities, risking our economy and higher taxes.
As venues in other cities modernize, Saskatoon will host fewer conferences, conventions, concerts, and touring productions. Events that cannot find the space and services they need will be held elsewhere, along with the related hotel stays, restaurant and retail spending, jobs, and future bookings.
If nothing changes, this could impact:
-
Visitor spending: Events are good for the economy and local businesses. A 2023 PRAXIS Consulting study estimated that one major concert brings about $10 million (2023 dollars) in visitor spending. A two-day convention with 1,000 delegates brings about $840,000 (2023 dollars) and about 1,400 hotel room nights.
-
Downtown tax base: Maintaining a downtown supports property values, strengthens the municipal tax base, and helps fund City services that residents across Saskatoon enjoy. If City Centre property values dropped by 10%, more than $3 million a year would shift to taxpayers elsewhere in the city. With office vacancy at 19.4% at the end of 2025, investing in downtown’s long-term competitiveness is critical.
-
Maintenance costs: SaskTel Centre expects to need about $100 million in repairs over the next 10 years to maintain current levels of service and operations. That includes a new ice plant, new rooftop heating and cooling units, and repairs to its roof, water lines, and boilers. This work maintains existing systems and does not add new features for fans or touring shows.
-
Business events: Discover Saskatoon’s records show 18 business events since January 1, 2018, that were lost or turned down for reasons related to the venue. These events requested about 23,900 hotel room nights and represent an estimated $15.8 million in missed money spent in Saskatoon.
SOURCES


ACCESSIBILITY AND SERVICES
SaskTel Centre and DEED's event centre have different accessibility features and visitor services.
SaskTel Centre has only one public elevator, and its arena floor is not wheelchair accessible. The early design for the new event centre will meet modern accessibility standards. The goal is for everyone to move through the building without barriers.
The design includes wider seats and accessible seating throughout the building, with room for a companion and clear views. It also includes more accessible washrooms, more food and drink counters, elevators between levels, and safe routes to drop-off areas, transit, and parking.
SOURCES
EVENT CENTRE: REHAB OR REPLACE
Rehabilitation versus replacement have different costs, timelines, and funding options.
Based on examples from other cities such as Hamilton, ON, the City estimates that modernizing SaskTel Centre will cost more than $300 million and the facility would be closed for approximately two years.
Because the building is not downtown, tools like tax increment financing (TIF) would not apply. TIF uses new tax revenue from downtown growth to help pay for a project. a rehabilitation would mean considering property tax increases.
A cost comparison of both options will go to a city council committee in January 2027.
SOURCES
.png)

IMPACT ON TAXPAYERS
The capital cost for DEED can be covered without raising property taxes.
The City does not plan to increase property taxes to pay for the district. It will use a mix of sources, including provincial and federal funding, and tax increment financing (TIF). See Funding for more information.
Rehabilitating SaskTel Centre would be funded differently. In fact sheets, the City has said TIF and “other key tools” would not apply at the current site because the building is not downtown. No provincial or federal funding is currently attached to a rehabilitation. This leaves property taxes as the only funding source to rehabilitate SaskTel Centre.
The City will bring a cost comparison of both options to a city council committee in January 2027.
SOURCES
THE IMPORTANCE OF DOWNTOWN
A strong downtown supports the economic health of the whole city.
The City’s downtown plan calls the City Centre the “collective heart” of Saskatoon because it “has a direct impact on the rest of the city.” Downtown contributes a large share of Saskatoon’s property tax. If downtown property values fall, the share of taxes carried by other properties goes up.
Here’s how downtown Saskatoon’s share of property tax compares with its size, and what’s at stake with DEED:
-
According to the City, Saskatoon’s City Centre (downtown, plus the Broadway, 20th Street West, and College Drive areas) covers less than 1% of the city’s total area but contributes over 10% of its property tax.
-
Based on DEED Facts' calculations from City data, each hectare of taxable land downtown pays about $306,000 a year in property tax. This is about 8 times as much as the city average of about $37,000 because downtown fits more homes and businesses per hectare.
-
Given the $358.6 million property tax levy for 2026, if City Centre property lost 10% of its value, more than $3 million a year in City tax would shift to the rest of Saskatoon.
-
According to a February 3, 2026, report from CBC News, Saskatoon’s downtown office vacancy rate was 19.4% at the end of 2025, up from 16.4% in the last quarter of 2024.
DEED will attract new public investment in the area where the City collects the most property tax per hectare. Under the City’s 2024 funding strategy, part of Saskatoon’s share of the cost would come from new tax growth inside the district.
SOURCES

MISSED OPPORTUNITIES
If Edmonton or Winnipeg hosted it, it could have landed here too.
When an organizer cannot secure the capacity, flexibility, technology, hospitality, production efficiency, or overall delegate and patron experience it requires, that event does not simply disappear; it is generally hosted in another city, and the associated spending, exposure, repeat visitation, and future booking potential move with it. Each lost bid therefore represents both an immediate economic loss and a longer-term missed opportunity to build Saskatoon’s reputation as a competitive event destination.
•
•
•
•
•
DETAILS


WAYS TO PAY FOR IT
Multiple funding sources will get DEED done.
Along with funding from provincial and federal governments, the City’s current plan names other sources that will not raise property taxes. These include, but are not limited to:
-
Amusement tax: A charge on tickets to events at TCU Place and SaskTel Centre today, and at the new event centre once it opens.
-
Parkade revenue: Money from the new City-owned parkade.
-
Tax increment financing (TIF): As the district brings new buildings and businesses downtown, property values in the area rise, resulting in more property tax collection. TIF sets aside that additional tax revenue to help pay for the facilities.
-
Reserve funds: Money the City has already saved in the Property Realized Reserve and the SaskTel Centre Reserve.
-
Partner investment: The City is in discussions with Muskeg Lake Cree Nation about investment and the potential of converting the land into an urban reserve. Talks are under a non-binding agreement. No terms or dollar figures are public yet, and both councils must approve any deal.
The City will bring an updated funding plan to the Governance and Priorities Commitee in January 2027.
SOURCES
NEED TO COMPETE
Saskatoon competes with other cities to host concerts, conventions, and major events.
Events affect more than the people who attend them. Visitors from out of town spend money on hotels, meals, shopping, and gas, which supports wages and local businesses. According to Discover Saskatoon, visitor spending reached $897.5 million in 2025, up 12.5% from the year before. As reported in its 2025 Annual Report, Discover Saskatoon won 56% of the business-event bids it submitted in 2025, against an industry average of about 30%, contracting 49,309 future hotel room nights.
Beyond visitor spending, access to entertainment, events, and amenities help make Saskatoon a place where people want to live and work. This supports local businesses in attracting and keeping employees, and makes the area more appealing to businesses considering where to locate or grow.
Having an event and conference centre downtown means more of that spending would go to nearby hotels, restaurants, shops, and attractions. SaskTel Centre reports that about 6 in 10 people who buy tickets to its major concerts come from outside Saskatoon. According to the City, about 1,668 hotel rooms are within a 5- to 15-minute walk from the site.
In 2023, a study commissioned by Downtown Saskatoon and the Greater Saskatoon Chamber of Commerce estimated that a major concert attracting approximately 13,000 attendees would generate about $10 million in economic activity. This includes spending at hotels, restaurants, retail stores, transportation providers, and other local businesses. By comparison, a two-day convention with 1,000 attendees was estimated to generate $840,000 in spending and approximately 1,400 hotel room nights.
Other cities also compete for these events. Edmonton opened a new arena in 2016 and Calgary’s arena is scheduled to open in 2027. SaskTel Centre opened in 1988 and TCU Place was last expanded in 2006. A larger convention centre would allow Saskatoon to host bigger conferences and trade shows, and more than one event at a time. A new event centre would include wider walkways, more washrooms and food counters, modern seats, and upgraded sound and lighting.
SOURCES
.png)

SASKTEL CENTRE LIMITATIONS
Tours choose where to stop based on cost, speed, and risk.
In its current state, SaskTel Centre has limitations that impact whether shows stop in Saskatoon.
The building has one small loading dock that is used only for merchandise. Show trucks back in through overhead doors and unload equipment by forklift. Most shows need extra forklifts and stagehands for setting up and taking down. The building has no modern rigging grid, which means shows need more riggers to hang their equipment. It also has one public elevator and a small kitchen. The number of dressing rooms and lounge spaces is not enough for most tours.
In a 2018 study, the City of Saskatoon found that although the seat count was appropriate, promoters need taller spaces and more room to rig. They also projected that SaskTel Centre’s limitations could gradually reduce the number of concerts Saskatoon hosts.
The planned event centre includes a loading dock for four tour trucks at once, two spots for TV broadcast trucks, and a freight tunnel. It also includes more elevators, larger kitchens, additional green rooms and dressing rooms, additional lounges and VIP spaces, and modern rigging, power, and staging. This new building will maintain all existing concert and event counts and could add four to five concerts a year.
SOURCES
PUBLIC SPACES
The district will include outdoor gathering spaces.
Saskatoon’s DEED Conceptual Design Report includes public plazas around the event centre and the updated, larger convention centre. These open spaces are planned for activities and gatherings before, during, and after events, and for everyday use on days when there is no event.
With power, water, and stages available to rent, these spaces could host markets, food festivals, outdoor concerts, and more.
Plans also include a community park north of 23rd Street with a play area, splash pad, dog area, and open lawn. A linear park would link the district to walking and cycling routes and to parking in the north.
Research from Destinations International and Tourism Economics found that most residents link tourism to the amenities they use. It also found that visitor-paid taxes help lower residents’ own tax bills.
SOURCES


WHAT'S NEXT
DEED Facts is regularly updated as new information becomes available.
Right now, two reports are scheduled for presentation to the City's Governance and Priorities Committee in January 2027:
-
Updated Cost and Funding Analysis (comparison of a new downtown event centre with SaskTel Centre modernization)
-
Updated Funding Plan